From installation to production, our team assists you in every step of the way.
To save on freight – the machine is shipped and delivered in the semi-knocked down condition in open-top containers. The installation team assembles and installs the machine as per the planned layout. The team trains and runs trial production at the site. Normal installation and commissioning take 2 weeks from start-up.